happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
IMG_5086.JPG
A cross connectA cross connect for the rebar. I like how they bend the rebar to squeeze it inside the column.Max&Bee-in-CMJul 02, 2010
IMG_5094.JPG
T connectionA T connection for the rebarMax&Bee-in-CMJul 02, 2010
IMG_5098.JPG
View from the entrance corridorStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CMJul 02, 2010
IMG_5035.JPG
Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CMJul 02, 2010
IMG_5039.JPG
Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CMJul 02, 2010
IMG_5040.JPG
Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CMJul 02, 2010
IMG_5067.JPG
Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CMJul 02, 2010
IMG_5070.JPG
LaundryThe rebar for the ground beams of the laundryMax&Bee-in-CMJul 02, 2010
IMG_5019.JPG
The fence posts shopThe friendly staff at the shop. We bought 100 posts, 3 meters in height for 160 baht each. Paid 8,000 baht deposit, and the balance of 8,000 baht 2 days later once the posts were ready for delivery. The shop is a full family operation, with mum and dad and the 2 kids running it.Max&Bee-in-CMJul 02, 2010
IMG_5027.JPG
Escorting the truckThe shop is about 15 km from the land, so we had to take them, as its quite difficult to describe the exact location.Max&Bee-in-CMJul 02, 2010
IMG_5031.JPG
The first postUnloading the first post from the truckMax&Bee-in-CMJul 02, 2010
IMG_5044.JPG
Posts and truckWe asked them to put 1/3 of the posts in each of 3 different locations around the land, to save carrying time.Max&Bee-in-CMJul 02, 2010
7141 files on 596 page(s) 370

Debug Info 
Debug Output: show / hide