|
Last additions |
|

Some Weird Window Framing Torture MachinechangnoiJul 03, 2010
|
|

Kitchen Sliding WindowschangnoiJul 03, 2010
|
|

Large Lounge Sliding DoorschangnoiJul 03, 2010
|
|

Rented formworkWe rented it, not sure how much yet, will get the bill when we finish, but should be no more than 5,000 baht.Max&Bee-in-CMJul 02, 2010
|
|

Ready for installWaiting to be installed into placeMax&Bee-in-CMJul 02, 2010
|
|

Hammering the support sticksHave to ensure the formwork doesn't collapse when the concrete is pouredMax&Bee-in-CMJul 02, 2010
|
|

Front porchThe front porch was incorrectly placed about 20 cm below the level of the house floor, so they had to redo it today.Max&Bee-in-CMJul 02, 2010
|
|

Attaching the formworkLots of sticks are used to reinforce the formwork.Max&Bee-in-CMJul 02, 2010
|
|

Ground beams rebar doneAll the rebar for the ground beams has been completed. Next step is the form work for the concrete.Max&Bee-in-CMJul 02, 2010
|
|

Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CMJul 02, 2010
|
|

The meals areaLooking at the meals area at the rear left of the house.Max&Bee-in-CMJul 02, 2010
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
369 |  |
 |
 |
 |
|

|
|
|