|
Last additions |

Support for beamWe needed to make a large foundation for the support of the beams helping to hold up the roof, as there is no ground beam under this point. Max&Bee-in-CMSep 29, 2010
|
|

Welding the support columnTwo steel beams (22kg) are welded in a T bar configuration to help support the roofMax&Bee-in-CMSep 29, 2010
|
|

Floor structure for support columnThis one is in the master bathroom, embedded in the double wallMax&Bee-in-CMSep 29, 2010
|
|

Permanent support column is welded into placeThis one helps to hold the roof up in the master bathroomMax&Bee-in-CMSep 29, 2010
|
|
|

Weird contraptionThis weird looking thing was holding up part of the sagging roofMax&Bee-in-CMSep 29, 2010
|
|
|
|
|
|
|

Jacking up the cross jointsAll the cross connects/joints in the metal structure were jacked up to level as the trusses were made and welded into place.Max&Bee-in-CMSep 29, 2010
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
346 |  |
 |
 |
 |
|

|
|
|