|
Last additions |
|

Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.chiymanDec 27, 2010
|
|

Ditto previos photographchiymanDec 27, 2010
|
|

Backfilling the footings the next daychiymanDec 27, 2010
|
|

Backfilling and cutting trench for the ground beams.chiymanDec 27, 2010
|
|

Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
|
|

Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
|
|

First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiymanDec 27, 2010
|
|

A happy constructor with a Pepsi!chiymanDec 27, 2010
|
|
|

Another view of the footings before the concrete pour.chiymanDec 27, 2010
|
|

Clearing the way for the Concrete truck. (The chaps who had dug the holes had left the soil right by the edges of the holes).chiymanDec 27, 2010
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
334 |  |
 |
 |
 |
|

|
|
|