happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSCF4919.JPG
Water connection from the villiage supply from the Klong - so long as the chap in charge remembers to turn the pump on!chiymanDec 27, 2010
DSCF4911.JPG
Lunch BreakchiymanDec 27, 2010
DSCF4912.JPG
Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.chiymanDec 27, 2010
DSCF4913.JPG
Ditto previos photographchiymanDec 27, 2010
DSCF4914.JPG
Backfilling the footings the next daychiymanDec 27, 2010
DSCF4915.JPG
Backfilling and cutting trench for the ground beams.chiymanDec 27, 2010
DSCF4906.JPG
Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
DSCF4907.JPG
Getting everything straight and levelled before the big concrete pour.chiymanDec 27, 2010
DSCF4908.JPG
First of 3 Concrete truck arrives. Pour direct to the footing and also filling the concrete pipes which form the below ground section of the main building columns.chiymanDec 27, 2010
DSCF4909.JPG
A happy constructor with a Pepsi!chiymanDec 27, 2010
DSCF4910.JPG
Lunch BreakchiymanDec 27, 2010
DSCF4899_resize.jpg
Another view of the footings before the concrete pour.chiymanDec 27, 2010