DSCF5073.JPG
Steel waiting to be lifted into place for inclusion in the roofchiymanJan 18, 2011
DSCF5072.JPG
A view from the farm landchiymanJan 18, 2011
DSCF5071.JPG
Looks very skeletal but gives an idea of the overall height of the housechiymanJan 18, 2011
DSCF5070.JPG
chiymanJan 18, 2011
DSCF5090.JPG
Platforms for construction of the roof which was very high - about 5m for eaves to top ridge. I wanted to have the roof as the mail recognisable feature of the house and was prepared to pay the additional cost for this.chiymanJan 18, 2011
DSCF5078.JPG
Seems like a lot of steel in that roof. Shame they didnt follow my original design - would have saved about 25% of the steel required - what can one do when you are not there to supervise directly?chiymanJan 18, 2011
DSCF5077.JPG
Another view or roof construction progresschiymanJan 18, 2011
DSCF5076.JPG
The roof construction wee under way - required a lot of Yuca poles as scaffoldingchiymanJan 18, 2011
DSCF5075.JPG
Supporting yuca poles for the roof constructionchiymanJan 18, 2011
DSCF5046.JPG
Finishing the first floor slab concretechiymanJan 18, 2011
DSCF5047.JPG
Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiymanJan 18, 2011
DSCF5056.JPG
Good quality hardwood doorframe squared and supported before blockwork constructionchiymanJan 18, 2011