The skeleton of the de-mountable air-conditioned site office being erected.IansMar 14, 2011
|
|
The whole builing has been has been setout with "string-lines" (actually fishing line) to ensure all footings etc are in the correct location.IansMar 14, 2011
|
|
|
Perimeter wall beam20x30cm concrete beam with 4 x 4hun rebar....
After seeing it in real....I think we overdo it...but that's ok!
MaseratimartinMar 11, 2011
|
|
Perimeter wallFooting holes digged through our fruit tree garden...MaseratimartinMar 11, 2011
|
|
PreparationsAlways thinking of the next step and keeping people busy.
Here I clean up for measuring of the future pool/guest house.
MaseratimartinMar 11, 2011
|
|
SupervisorMy two ladies always keeping an eye on that things go right....MaseratimartinMar 11, 2011
|
|
Perimeter wall holesAfter we cleaned up the wooden fence of our neighbour...sitting about 0.5m on our side....the footing holes are being digged...MaseratimartinMar 11, 2011
|
|
|
Perimeter wall construction trainingWith all the knowledge from our forum I personally advice the troups how to do the perimeter wall correct...ha ha!MaseratimartinMar 11, 2011
|
|
Garage footing holesThe footing holes 1x1x1m for the garage are digged.
I want the garage done asap to get a clean place to rest in the shadow...and to have a dry place for materials!
Size of Garage 6.5x6.5m with 2.25x5m opening...20cm load bearing wall on 15cm slab with 50x20cm foundation (6x 4hun rebar)
MaseratimartinMar 11, 2011
|
|
Stainless gatesA local shop with nice gate designs....MaseratimartinMar 11, 2011
|
|