|
Last additions |
|
|
Kitchen tile long viewnote how the odd size tiles were placed where they will be hidden by future cabinetry ShastadadApr 21, 2011
|
|
|
|
Master Deck floor tileingShastadadApr 21, 2011
|
|
last trialforgive my limited skills :)erikr69Apr 20, 2011
|
|
Last trialforgive my limited skills :)erikr69Apr 20, 2011
|
|
Last triala trial layouterikr69Apr 20, 2011
|
|
Last trialsome different angleserikr69Apr 20, 2011
|
|
Cement bathtub in outdoor courtyard/bathroom.I had this 1/2 ton cement bathtub constructed offsite at a factory in Phuket. Because the istallation of the tub is in an outdoor courtyard, we could'nt use a standard prefabricated air-jet fiberglass tub. The sun's U.V. rays would have eaten-up a fiberglass tub inside 6 months.
Have a look at the other folders for how we built it and had it installed.verticaliftApr 19, 2011
|
|
Cement bathtub.A 2 meter section of this 30cm thick cement wall had to be knocked down and then re-built to get the 1/2 ton bathtub into the courtyard.
We used a truck with a crane in case you're wondering how we did it.verticaliftApr 19, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
287 | |
|
|
|
|
|
|
|