Partially Dug SepticThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozerSep 26, 2011
IMG_1505.jpg
Inbound Water TestDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozerSep 26, 2011
IMG_1495.jpg
Drain Water TestThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozerSep 26, 2011
IMG_1492.jpg
Setting Toilet DrainSetting the toilet at the correct distance per the plan. dozerSep 26, 2011
IMG_1491.jpg
Toilet Drain with Vent OpeningThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozerSep 26, 2011
IMG_1488.jpg
Various PVC PipesShowing inbound water piping, a sink drain and vented toilet drain.dozerSep 26, 2011
IMG_1480.jpg
Cutting ToolThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozerSep 26, 2011
IMG_1473.jpg
Vent Pipe WiredA 3/4" vent pipe wired in place. dozerSep 26, 2011
IMG_1511.jpg
Still Digging SepticsThe septic chambers will each be about 2 meters deep and accommodate 6 round 1.2 m cement pieces. dozerSep 26, 2011
ElectricSwitches.JPG
Electric Switch DiagramOne of the electric diagrams showing an overview of the switch scheme, there we also detail diagrams for switches and another set for plugs. dozerSep 26, 2011
DSCN0465.jpg
Junction BoxA junction box in the attic. The connections are done with wire nut connectors and no tape.dozerSep 26, 2011
DSCN0437.jpg
Pop Up BoxesThe pop up receptacles as seen in the study. This one has a LAN connection and electric connection. dozerSep 26, 2011