Partially Dug SepticThe seepage tanks here will be 1.2 m wide cement rounds with an exterior of stone aggregate. dozerSep 26, 2011
|
|
Inbound Water TestDuring the inbound water pressure test the only place one should see any moisture is at the lids if they haven't be glued in place. dozerSep 26, 2011
|
|
Drain Water TestThe other end of the drain pipe is capped and tested for all drain pipes prior to pouring of any concrete. dozerSep 26, 2011
|
|
Setting Toilet DrainSetting the toilet at the correct distance per the plan. dozerSep 26, 2011
|
|
Toilet Drain with Vent OpeningThe elbow has the all important vent opening which will be vented up through the roof and prevent sluggish toilet syndrome. dozerSep 26, 2011
|
|
Various PVC PipesShowing inbound water piping, a sink drain and vented toilet drain.dozerSep 26, 2011
|
|
Cutting ToolThese cutting tools make it easy to get a nice cut on pvc. These are also required for cutting of the orange hot water flexi piping.dozerSep 26, 2011
|
|
Vent Pipe WiredA 3/4" vent pipe wired in place. dozerSep 26, 2011
|
|
Still Digging SepticsThe septic chambers will each be about 2 meters deep and accommodate 6 round 1.2 m cement pieces. dozerSep 26, 2011
|
|
Electric Switch DiagramOne of the electric diagrams showing an overview of the switch scheme, there we also detail diagrams for switches and another set for plugs. dozerSep 26, 2011
|
|
Junction BoxA junction box in the attic. The connections are done with wire nut connectors and no tape.dozerSep 26, 2011
|
|
Pop Up BoxesThe pop up receptacles as seen in the study. This one has a LAN connection and electric connection. dozerSep 26, 2011
|
|