Rough Bathroom LayoutsThe drain pipes for the floor drains are 3 inch, toilets are 4 inch, sinks are 1.5 inch. The purpose of the internal formwork is to later pour the shower floors since they will be a lower level. dozerSep 26, 2011
IMG_1879.jpg
Bathroom LayoutBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozerSep 26, 2011
IMG_1875.jpg
Septic CoversScraping the bronze septic lids after the concrete walkway pour. dozerSep 26, 2011
IMG_1858.jpg
6" Septic PVC Access and LidThe 6" Septic PVC access lid is covered in preparation for the walkway pour. Note the 6 hun vent pipe extending from the septic. It will be vented up through the wall and roof with the other vent pipes from the project. dozerSep 26, 2011
IMG_1833.jpg
Preliminary Layout of Septic AccessAfter this we vented the septics and change the access lids to the 6" heavy duty type. dozerSep 26, 2011
IMG_1729.jpg
Rough Plumbing LayoutAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozerSep 26, 2011
IMG_1693.jpg
Setting Up the PumpBefore getting too far the pump needs to be set up for so the inbound lines can be pressure tested. Any problems can be checked/fixed before concrete is poured over any piping. dozerSep 26, 2011
IMG_1556.jpg
Drain Pipes / Inbound WaterAll of the PVC piping is wired into place prior to setting in concrete to prevent it from angling during the pour. dozerSep 26, 2011
IMG_1531.jpg
PVC Pipe LidsAll PVC piping is covered to prevent concrete or other blockage from getting in it. Also the covers allow the inbound lines to be pressure tested. dozerSep 26, 2011
IMG_1520.jpg
Shower Enclosure BeamA ground beam is set up to be poured where the shower enclosure will go. dozerSep 26, 2011
IMG_1516.jpg
1 and 1/2 bathroomsThe view of the beam setup for 1 and 1/2 bathrooms. dozerSep 26, 2011
IMG_1513.jpg
Leveling the Toilet PipeAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozerSep 26, 2011