Setting in the Cross SupportsSetting the cross supports into place for the exterior ceiling.dozerSep 26, 2011
|
|

Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozerSep 26, 2011
|
|

Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozerSep 26, 2011
|
|

Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozerSep 26, 2011
|
|

Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozerSep 26, 2011
|
|

Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozerSep 26, 2011
|
|

Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozerSep 26, 2011
|
|

Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozerSep 26, 2011
|
|

Level Establish for Outer StepThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozerSep 26, 2011
|
|

Drywall Sheeting AppliedThe drywall sheeting is affixed to the upper level of the interior ceiling. It is screwed into place using 1 1/4" sheetrock screws. dozerSep 26, 2011
|
|

Bedroom InstallationThe first thing done is that the level of the lower step of the ceiling is established around the outside perimeter. The frame is being set up for a lower step which extends outward 60 centimeters and is 15 centimeters deep. dozerSep 26, 2011
|
|

Ceiling Secured RoomThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozerSep 26, 2011
|
|