|
| Last additions |

Repair WorkThis was not easy repair work done (because of lack of access) done by the wood working group. Part of the screen cover had not be laid correctly and there was an opening with no screen protection. dozerSep 27, 2011
|
|

Repairing ScreenFitting the screen into place over some spots that were inadvertently missed by the ceiling installer.dozerSep 26, 2011
|
|

Above Screen SectionScreen section above the ceiling. dozerSep 26, 2011
|
|

Wood TrimWood trim installed around the columns by the ceiling guys needed to be reworked because some of the joints were not done properly. dozerSep 26, 2011
|
|

Wood Trim ExteriorWood trim installed butting up against the fascia board. dozerSep 26, 2011
|
|

Metal ScreenAn aluminum based screening material being used here. This is much more expensive than the vinyl type eventually used and not noticeably more durable. dozerSep 26, 2011
|
|

Blue Vinyl MeshingThe blue vinyl meshing being fixed into place. If there are any voids it is important to mention it and follow up and check to make sure it gets fixed because it is hard to get at later. dozerSep 26, 2011
|
|

Two Types of ScreeningTwo types of screening are installed under the smart board. The screen prevents insects entering the attic area since the smart board is vented. dozerSep 26, 2011
|
|

Affixing ScreenAffixing a piece of metal screen to the aluminum ceiling frame. dozerSep 26, 2011
|
|

Cutting Smart BoardThe smart board comes in sheets and is cut to size as needed. dozerSep 26, 2011
|
|

Aluminum Rail FrameworkInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozerSep 26, 2011
|
|

Exterior Ceiling FrameInstalling the horizontal members of the aluminum frame on the exterior of the house. dozerSep 26, 2011
|
|
| 7142 files on 596 page(s) |
 |
 |
 |
 |
 |
253 |  |
 |
 |
 |
|

|
|
|