happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
IMG_2003~0.jpg
LintelThe form work for a lintel above a door opening. dozerSep 27, 2011
IMG_2000.jpg
Side BeamU shaped pieces of rebar are used to keep the form work from bulging during the pour of the side column support for the door.dozerSep 27, 2011
IMG_1997.jpg
FormworkAnother view of the form work in place to secure the door frame to the adjacent walls. dozerSep 27, 2011
IMG_1993.jpg
Prepping Door FrameNails are used on the exterior of the frame. Rebar extends out of the aerated block. A vertical beam will be poured on either side of the door.dozerSep 27, 2011
IMG_1992.jpg
Nail PreppingNails on the frame as well as a 9mm piece of rebar which will be in the vertical beam. dozerSep 27, 2011
IMG_2813.jpg
Installing Shelving UnitThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozerSep 27, 2011
IMG_2796.jpg
Mounting the Upper CabinetsStarting to Mount the Upper CabinetsdozerSep 27, 2011
IMG_2791.jpg
Hardware to Support Upper CabinetsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozerSep 27, 2011
IMG_2393.jpg
Shelving UnitThis opening is designed for another shelving unit (Kitchzo). dozerSep 27, 2011
IMG_2381.jpg
Tiling CompleteThe tiling and grouting of the cabinets are complete. dozerSep 27, 2011
IMG_2376.jpg
Tiling on the InsideTiling on the inside of the cabinets.dozerSep 27, 2011
IMG_2363.jpg
Tiled Table LegThe tiled and edged table leg prior to it being grouted.dozerSep 27, 2011
7141 files on 596 page(s) 248

Debug Info 
Debug Output: show / hide