Finished Secured Metal PartitionThe completed metal partition with door. dozerSep 27, 2011
|
|
Rear WindowThe secured rear opening. dozerSep 27, 2011
|
|
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozerSep 27, 2011
|
|
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozerSep 27, 2011
|
|
Partial DoorThe beginning of the door and lower panel. dozerSep 27, 2011
|
|
Guide LinesEstablishing a guide line for the cross supports. dozerSep 27, 2011
|
|
Welding Lower BeamWelding the lower beam in place. dozerSep 27, 2011
|
|
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozerSep 27, 2011
|
|
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozerSep 27, 2011
|
|
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozerSep 27, 2011
|
|
Working on Top MeshThe top metal mesh work is additionally welded to the roof structure for support. dozerSep 27, 2011
|
|
Walls ReinforcedThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozerSep 27, 2011
|
|