|
Last additions |
Lifting Mural into PlaceLifting the engraving into place. dozerSep 27, 2011
|
|
Prep Back of MuralThe adhesive is applied to the back of the engraving. dozerSep 27, 2011
|
|
Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozerSep 27, 2011
|
|
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozerSep 27, 2011
|
|
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozerSep 27, 2011
|
|
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozerSep 27, 2011
|
|
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozerSep 27, 2011
|
|
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozerSep 27, 2011
|
|
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozerSep 27, 2011
|
|
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozerSep 27, 2011
|
|
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozerSep 27, 2011
|
|
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozerSep 27, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
245 | |
|
|
|
|
|
|
|