IMG_2760.jpg
Lifting Mural into PlaceLifting the engraving into place. dozerSep 27, 2011
IMG_2755.jpg
Prep Back of MuralThe adhesive is applied to the back of the engraving. dozerSep 27, 2011
IMG_2752.jpg
Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozerSep 27, 2011
IMG_2748.jpg
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozerSep 27, 2011
IMG_2743.jpg
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozerSep 27, 2011
IMG_2741.jpg
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozerSep 27, 2011
IMG_2740.jpg
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozerSep 27, 2011
IMG_2720.jpg
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozerSep 27, 2011
IMG_2718.jpg
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozerSep 27, 2011
IMG_2715.jpg
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozerSep 27, 2011
DSCN0470.jpg
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozerSep 27, 2011
DSCN0471.jpg
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozerSep 27, 2011