Desks Ready for Granite TopThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozerSep 27, 2011
|
|
Desk FittingThe installer adjusting the cut and edged granite to have the same overhang on all sides. dozerSep 27, 2011
|
|
DeskOne desk with the granite top installed, the other ready to go. dozerSep 27, 2011
|
|
Silicone AdhesiveUsing sony brand silicone adhesive to glue the granite top to the desk. dozerSep 27, 2011
|
|
Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozerSep 27, 2011
|
|
Adjusting the Counter TopThe countertop being adjusted. dozerSep 27, 2011
|
|
Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozerSep 27, 2011
|
|
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozerSep 27, 2011
|
|
Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozerSep 27, 2011
|
|
Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozerSep 27, 2011
|
|
Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozerSep 27, 2011
|
|
Final CracksAny slight openings are grouted by the installers.dozerSep 27, 2011
|
|