|
Last additions |
WalkwayThere is a 1 m wide walkway along the front to the patio which goes all the way around the house. There is a step up to the patio of about 30 cm. dozerSep 27, 2011
|
|
Columns and Utility UnitsThe second utility/storage unit has a split roll up door. Each unit is about 4m wide x 6 m long. There are overall 30 columns throughout the project.dozerSep 27, 2011
|
|
Drive Way and Roll Up DoorThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozerSep 27, 2011
|
|
Putting up the CurtainsThe curtain and curtain rails were bought from a curtain shop at jatujak market, price was reasonable and nice r looking that most. dozerSep 27, 2011
|
|
Curtain RailInstalling the Curtain RaildozerSep 27, 2011
|
|
Under Cabinet Stainless RailsInstalling under cabinet stainless rails used to hang things (pots, pans, etc). dozerSep 27, 2011
|
|
CabinetsKitchzo kitchen cabinets as installed. dozerSep 27, 2011
|
|
More Paint ApplicationRolling paint on the eves overhanging the gable. dozerSep 27, 2011
|
|
Painting External CeilingPainting the external ceiling with a water based paint, timbershield. dozerSep 27, 2011
|
|
Applying Wall Putty to Ext CeilingMore putty put in the cracks between the ceiling panels. dozerSep 27, 2011
|
|
Applying Wall Putty to Ext CeilingUsing putty to cover the junction between the smart boards.dozerSep 27, 2011
|
|
Painters Start PrimerThe painters start applying primer to the ceiling. dozerSep 27, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
236 | |
|
|
|
|
|
|
|