Footing frame baseThe framework base for the footings made out of 6 mm rebar.
dozerSep 27, 2011
|
|
Footing holeThe footing hole and base framework on a poured concrete lip.
dozerSep 27, 2011
|
|
Footing holeThe footing hole with rebar framework.
dozerSep 27, 2011
|
|
Form work for ground beamThe wood form work to support the pour of the ground beam which sits on the footing. The ground beam will be 10 centimeters wide by about 20 centimeters deep.
dozerSep 27, 2011
|
|
Ground BeamPour in progress.
dozerSep 27, 2011
|
|
Ground BeamAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.
dozerSep 27, 2011
|
|
Staggered Ground BeamA staggered ground beam design to accommodate for unevenness in the ground level.
dozerSep 27, 2011
|
|
Video WalkthroughA quick video walk though of the project a while after completion. dozerSep 27, 2011
|
|
Side Walkway and GardenThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozerSep 27, 2011
|
|
StudySmall sandstone tiles are used on the wall area of the study.dozerSep 27, 2011
|
|
Storage Unit InsideAnother view of the storage/utility room with metal racks currently used for storage. dozerSep 27, 2011
|
|
Ladder and AccessThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozerSep 27, 2011
|
|