Rough Coat RenderThis shows a color coat of render being applied over a dried rough coat render. There is a certain technique which we employed after some initial missteps to get the block outline not to show through to the color coat.dozerSep 27, 2011
IMG_3100.JPG
Blocks being LaidHere the cinder blocks are being laid according to a 'straight' line of fishing wire which is used to keep the rows level.dozerSep 27, 2011
IMG_3103.JPG
6mm Tie-in RebarThis shows a piece of 6mm rebar which sits in between blocks as they are laid and goes through the column framework. This is used to secure the blocks on either side of the column together.dozerSep 27, 2011
IMG_3107.JPG
Wall Section with OpeningsThis shows a section of the perimeter wall, with column openings each 2.5 m. Notice that the columns are always poured after the blocks are laid for better adhesion. dozerSep 27, 2011
IMG_3131.JPG
Pouring a ColumnThe columns are poured after the blocks are laid in place. Here a piece of metal is being used to vibrate the concrete into place within the formwork.dozerSep 27, 2011
IMG_3135.JPG
Rebar Framework for Top BeamThe rebar used in the top beam is 2 strands of 9mm rebar with 'chain' sections to keep the bars equidistant.dozerSep 27, 2011
IMG_3153.JPG
Form Work for Top BeamThe form work is in place to pour the top horizontal beam.dozerSep 27, 2011
IMG_3186.JPG
Wetting Down the WallIt is essential to wet the wall down prior to application of the render coat.dozerSep 27, 2011
IMG_3190.JPG
Colored Render Coat being AppliedHere is the render coat being applied. This takes some trial and error to get correct with color render.dozerSep 27, 2011
IMG_3429.JPG
Red Perimeter Wall SectionAesthetically, the wall finish looks nicer without the underlying blocks showing through. Although the pattern seems to diminish with time (due to the blocks drying out), we now have figured out how to get no show through at all. dozerSep 27, 2011
IMG_3044.JPG
Small Size Cinder BlocksThe smaller size cinder blocks are used only in the construction of the perimeter walls.dozerSep 27, 2011
IMG_3058.JPG
Footing HoleThe footings are dug out 1 m. square by up to 40 cm. deep depending on the slope of the land. As the ground beam will sit right on the footing, the footings are poured so that they are level.dozerSep 27, 2011