This shows two water pipes; a drain and inbound water pipe. There are 5 inbound water pipes (kitchen sink, bathroom sink, toliet, shower, urinal) and 6 outbound (shower drain, bathroom floor drain, urinal, toilet, bathroom sink, kitchen sink). dozerSep 27, 2011
|
|
Plumbing Entry ExitThis shot shows the 3 plumbing entry/exit areas within their designated over size cinder blocks (1 entry/exit in the forward kitchen, 2 in the bathroom). Also note the vent pipes which will run vertically up through the ceiling, will be tied together, and exit through the roof.
dozerSep 27, 2011
|
|
Primer Coat of Red OxideEither two coat of primer should be applied or alternatively one coat of primer and another coat of a finish paint. This project we used red oxide primer. dozerSep 27, 2011
|
|
|
Roof TilesLaying roof tiles in place up to the roof valley.dozerSep 27, 2011
|
|
Roof ValleyA scored 1 meter wide strip of rust resistant galvanized is used in the roof valley. A leak proof valley requires a wide piece of metal to ensure that water doesn't splash in during heavy storms. dozerSep 27, 2011
|
|
Fascia BoardThe fascia board being applied. It fits nicely in a groove under this CPAC monier roof tiles. The bird guard is applied while this fascia board is being applied. dozerSep 27, 2011
|
|
Vent TilesThis type of special tile is to vent the plumbing appliances up through the roof. All of the vents for this project ascend through the interior walls and will be vented jointly out of this one roof tile.dozerSep 27, 2011
|
|
Applying Roof TilesRoof tiles being set in place.dozerSep 27, 2011
|
|
Visual Roof InspectionAs long as there is none of the foil insulation which adheres to, and is installed at the same time the cement tiles are installed, the roof can be inspected visually during rain storms for leaks. If the foil has been applied any roof leaks will be much harder to find and repair. dozerSep 27, 2011
|
|
Protective Plastic Bird GuardThere will be two sheets of the facia board upon which the lip of the tile rests. A protective screen which is designed to sit right under the tile, is placed between the two pieces of facia to eliminate any problems with entry from birds or other pests. dozerSep 27, 2011
|
|
Facia BoardThis show the first sheet of facia after installation. There will be two sheets, an 8" (pictured) and 6" which will be set over the initial sheet overlapping on the top.dozerSep 27, 2011
|
|