Last additions |
Tile SpacersSpacers being used laying the floor tiles to maintain a consistent spacing. dozerSep 27, 2011
|
|
Applying 2" Composite Sheeting on SoffitThe soffit is finished with 2" Shera brand composite sheeting. These are nice and functional, but more expensive than flat composite GRC sheeting. dozerSep 27, 2011
|
|
Tiling the Great RoomTiling in process. There are different tiles used in the kitchen, great room and bedrooms. The tile is laid over a concrete slurry mix and leveled using straight lines.dozerSep 27, 2011
|
|
Terrazzo CounterThis shows the raw dry concrete mixture (using a porland white cement + fine aggregate stones) being laid on top of the counter surface. It is important to not have too wet a mixture for strength of the finished counter top.dozerSep 27, 2011
|
|
Terrazzo Counter TrowelingThe dry concrete mix (with added natural pigment for coloration) is hand troweled into place. This requires experienced guys who know how to add just enough water (which is sprinkled on top of the dry concrete mix so it can be worked) and apply pressure to work out the air bubbles.dozerSep 27, 2011
|
|
Exterior Walkway TilingThis shows rebar strips being pressed into the newly poured exterior concrete surface to make a faux tile finish. The rebar strips are used after the concrete has had time to 'set up' so that the impression can be made by pressing the rebar frame into the concrete.dozerSep 27, 2011
|
|
Terracotta Tiles Being LaidTerracotta takes more care to lay than regular tiles. Due to the way the tiles are produced, they are not all the same size, much like grade C tiles -- therefore, extra care must be taken to make sure they come out looking straight in the given pattern. The tiles are pre dipped in a liquid silicone derivative so they can't degenerate with moisture. dozerSep 27, 2011
|
|
Grouting the Glass BlocksThe glass blocks are grouted using a colored premium grout (bacteria resistant) applied using a plastic bag as a application tube.dozerSep 27, 2011
|
|
Duct Work for Exhaust VentingThere are two exhaust vents one from the kitchen and one from the bathroom. This shows the ductwork used. The vent facing fits in the soffit framework.dozerSep 27, 2011
|
|
Unfinished Kitchen CounterThe counter showing the red bricks that will form the support structure and the wood framework which is temporarily used to support the counter pour. dozerSep 27, 2011
|
|
Archway SupportThe start of the archway support structure. There will be concrete poured in forms above the archway which is supported by a rebar framework welded to the roofing metal.dozerSep 27, 2011
|
|
Applying the Render Coat to the CounterThe render coat is applied to the counter, with exact sizes being maintained for the cabinet door openings. Great care is applied to make sure the corners are properly squared (a sign of a good workman).dozerSep 27, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
217 | |
|
|
|
|
|
|
|