IMG_9036.jpg
Archway Completed Section on the RightThe finished archway prior to rendering: notice the lower portion is poured within formwork and the upper portion is brick and mortar. The heavy lower portion is supported by a rebar strand framework which was welded on to the box section at the top. dozerSep 27, 2011
IMG_9058.jpg
Archway, Left SectionA view of all three of the archways.dozerSep 27, 2011
IMG_8871.jpg
LintelThe lintels about all windows are extended around the entire house, becoming a second ring beam (for added strength). Here we see the form work for the a lintel/ring beam. dozerSep 27, 2011
IMG_8929.jpg
Door FrameA vertical beam will be poured on either side of the door frame. The nail seen extruding from the frame is used as an anchor. It will become embedded in the poured vertical beam and lock the frame in place. dozerSep 27, 2011
IMG_8953.jpg
Bathroom PVC Door LockingThe bathroom PVC door has a similar method of locking it into place as a conventional door frame. The affixed hardware will become embedded in a vertical beam on either side of the door, locking it into place. dozerSep 27, 2011
IMG_8954.jpg
PVC Door SupportsThe PVC door for the bathroom will deform easily. Therefore supports must be added to ensure that during the pouring of the vertical beams or the lintel that the door frame doesn't bend.dozerSep 27, 2011
IMG_8963.jpg
Bedroom WallsThe internal bedroom walls were constructed of red brick. Notice the horizontal ring beam (extended door lintel) which spans the entire wall. This is required due to the height of the walls (3.15 meters). Also notice the vertical beams on either side of the door frame. dozerSep 27, 2011
IMG_8973.jpg
Bathroom Door after Pour of Vertical BeamsThe bathroom door after the vertical beams were poured.dozerSep 27, 2011
IMG_8995.jpg
Squaring Off the Window OpeningsThe window and door openings are squared off after being initially roughly finished. It is after this process that they will be the correct size and position. dozerSep 27, 2011
IMG_8999.jpg
Pour of ArchwaysThe archways are formed using plywood forms (as shown). The base of the form work is rounded pieces of plywood supported by 2 x 3 inch wood strips. dozerSep 27, 2011
IMG_8776.jpg
External True LineAn external true line is used to indicate the target external edge of the to be poured columns. This line should square up the same as the initial check did. dozerSep 27, 2011
IMG_8782.jpg
Column Form WorkThe form wood utilized is two sizes, 10 inch and 8 inch to create a column size approximated 8 inches square (which is 20 centimeters). You often see them nowadays going with 15 centimeter columns with minimized rebar (on other projects) which just doesn't have the durability, leads to structural cracking and worse.dozerSep 27, 2011