IMG_8769.jpg
Pipes after Floor PourA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozerSep 27, 2011
IMG_8814.jpg
Pressurized Water Pipe TestA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozerSep 27, 2011
IMG_8843.jpg
Capped PipesClose up of the caps temporarily used on the drain pipes.dozerSep 27, 2011
IMG_8851.jpg
Drain Pipe TestDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozerSep 27, 2011
IMG_9029.jpg
Hole for Submerged Water TankThis shows the start of the 1800 liter underground water tank. dozerSep 27, 2011
IMG_9044.jpg
Septic Service OpeningThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozerSep 27, 2011
IMG_9045.jpg
Septics Prior to Walkway PourThis shows the septics prior to the walkway being poured. dozerSep 27, 2011
IMG_8895.jpg
Wood to Support the Facia BoardWood is installed within the box sections of the roof structure to support the facia board which will be affixed. These members still to be painted after the box sections were cut. dozerSep 27, 2011
IMG_9203.jpg
Underside of Ridge BeamThe underside of a ridge beam showing the welds and also the underside of the CPAC tiles sitting on the battens. dozerSep 27, 2011
IMG_9251.jpg
Ceiling StructureThe C Lie suspension rails used are the heavier grade and are spaced at about 60 centimeters by 1 meter intervals. Note the tiered ceiling section on the left side (to support the two levels of ceiling structure).dozerSep 27, 2011
IMG_9258.jpg
External Soffit SupportsThe c lie suspension rails are used to support the heavy nature board (Shera brand) soffit.dozerSep 27, 2011
IMG_9272.jpg
More soffit structure + faciaShows the soffit structure including the cross sections and also the facia boards. dozerSep 27, 2011