Last additions
IMG_9051.jpg
Control UnitThe control unit for the breakers will be installed here. There are 6 zones attached to individual breakers. The breaker size depends on the load for that zone. Electrics are bticino matix. dozerSep 27, 2011
IMG_9052.jpg
Upper Switch box + Lower Receptacle boxThe switch boxes + power points are secured fastened within the wall at the designated points. dozerSep 27, 2011
IMG_9097.jpg
Junction BoxThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozerSep 27, 2011
IMG_9369.jpg
PVC Pipe Joined to Tested SectionThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozerSep 27, 2011
IMG_9409.jpg
Finished Submerged Water TankThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozerSep 27, 2011
IMG_9597.jpg
Lanko K11 WaterproofingThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozerSep 27, 2011
IMG_9629.jpg
Sloped Bathroom FloorsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozerSep 27, 2011
IMG_9681.jpg
Water HeaterThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozerSep 27, 2011
IMG_9713.jpg
Service Opening Water TankThe finished and plumbed water tank with the automatic pump on top. dozerSep 27, 2011
IMG_9728.jpg
Tank ServiceThe inside of the tank being cleaned of any debris.dozerSep 27, 2011
IMG_9769.jpg
Proper Leveling of ToiletThe toilet being check for level during installation.dozerSep 27, 2011
IMG_9062.jpg
Septics after PourThe service openings are placed to be level with the walkway. dozerSep 27, 2011
7141 files on 596 page(s) 204