happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSC04075.jpg
A mounted inside solid wood door prior to being varnished.dozerSep 27, 2011
DSC04072.jpg
Fitting a door in place. (22-Jun-04)dozerSep 27, 2011
DSC04049.jpg
Attaching a window to the frame.dozerSep 27, 2011
DSC04047.jpg
A close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozerSep 27, 2011
DSC04039.jpg
The windows being prepared for the top and bottom hinges. (18-Jun-04)dozerSep 27, 2011
DSC02134.jpg
This cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozerSep 27, 2011
DSC01106.jpg
A close up of a clear block. There is one centimeter of cement used between the blocks. (21-Apr-04)dozerSep 27, 2011
DSC01056~0.jpg
This shows the frame after stucco has been partially applied. (17-Apr-04)dozerSep 27, 2011
DSC01039.jpg
This shows a repair job on the clear glass bricks installed in the large bathroom. The first go round there was not any cement used between the bricks. (09-Apr-04)dozerSep 27, 2011
DSC00153.jpg
An embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozerSep 27, 2011
DSC00152~0.jpg
Rear door being repaired. The first time the door was framed without using anchor nails and had to be redone. It is in the process of be reframed. (02-Apr-04)dozerSep 27, 2011
DSC00139.jpg
Rear door framed and the side design of clear blocks. This side of clear blocks turned out to be poor placement, as when the door is open it blocks the light.dozerSep 27, 2011
7141 files on 596 page(s) 186

Debug Info 
Debug Output: show / hide