A bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozerSep 28, 2011
|
|
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozerSep 28, 2011
|
|
This shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozerSep 28, 2011
|
|
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozerSep 28, 2011
|
|
This shows a relatively think layer of stucco is applied.dozerSep 28, 2011
|
|
Here stucco has been affixed.dozerSep 28, 2011
|
|
Each cabinet section has a wood door. dozerSep 28, 2011
|
|
A counter section after the red brick enclosure is complete. (14-May-04)dozerSep 28, 2011
|
|
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozerSep 28, 2011
|
|
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozerSep 28, 2011
|
|
Partially finished counter with supporting brick columns.dozerSep 28, 2011
|
|
The counter will be supported by red brick columns. (13-May-04)dozerSep 28, 2011
|
|