happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSC04061.jpg
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozerSep 28, 2011
DSC04057.jpg
Cabinet in progress in the large bathroom. (21-Jun-04)dozerSep 28, 2011
DSC04054.jpg
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozerSep 28, 2011
DSC04053.jpg
Completed and tiled shower enclosure base. (20-Jun-04)dozerSep 28, 2011
DSC04043.jpg
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozerSep 28, 2011
DSC04021~0.jpg
The plumber is applying tile grout. (14-Jun-04)dozerSep 28, 2011
DSC04011.jpg
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozerSep 28, 2011
DSC04006.jpg
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozerSep 28, 2011
DSC03166~0.jpg
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozerSep 28, 2011
DSC03155.jpg
Large bathroom after cement has just been poured. (05-Jun-04)dozerSep 28, 2011
DSC03149.jpg
Water runoff pipes run into the septic like this. (05-Jun-04)dozerSep 28, 2011
DSC03124.jpg
The large bathroom sink plumbing showing hot and cold water entry and the larger water exhaust pipe.dozerSep 28, 2011
7141 files on 596 page(s) 170

Debug Info 
Debug Output: show / hide