|
Last additions |
Large bathroom bathtub and toilet.dozerSep 28, 2011
|
|
Small bathroom sink.dozerSep 28, 2011
|
|
Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozerSep 28, 2011
|
|
Bathtub tiled in. (27-Jun-04)dozerSep 28, 2011
|
|
Bathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozerSep 28, 2011
|
|
Heavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozerSep 28, 2011
|
|
This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozerSep 28, 2011
|
|
The plumber finishing off the shower enclosure.dozerSep 28, 2011
|
|
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozerSep 28, 2011
|
|
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozerSep 28, 2011
|
|
The bathtub will be supported by this brick enclosure.dozerSep 28, 2011
|
|
The large bathroom cabinet. dozerSep 28, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
169 | |
|
|
|
|
|
|
|