DSC00031.jpg
A footing is created about 10 inches high by about 10 cm. wide. Straight form wood is used to form the concrete. The concrete is poured around a metal rebar structure, of 3 hun full (vertical) with 2 hun full (cross supports). (16-Jan-04) dozerSep 28, 2011
DSC00029.jpg
Cement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozerSep 28, 2011
DSC00023.jpg
The base is cemented in place with a cement pour around 30 cm thick. dozerSep 28, 2011
DSC00022.jpg
The wide area show here will be for the entry gate. dozerSep 28, 2011
DSC00021.jpg
Supporting rebar structures, which are made by tying metal strands together are placed in the completed post hole. There is a metal base on the bottom of the structure. The metal used on the upright pieces is guage 3 hun full, the square supports are 2 hun full. dozerSep 28, 2011
DSC00020.jpg
Post holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozerSep 28, 2011
DSC06010.jpg
The completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozerSep 28, 2011
DSC05149.jpg
The electric is feed in from the street to the roof and attaches here.dozerSep 28, 2011
DSC05147.jpg
This shows a large socket box with 5 small plugs and a telephone connection. The only problem with these small socket receptacles being so close together is you cannot really use two adjacent plugs, because typically plugs will be a bit too wide. dozerSep 28, 2011
DSC05146.jpg
Larger socket receptacles used in the kitchen.dozerSep 28, 2011
DSC05145.jpg
The official electric meter at the street. (21-Aug-04)dozerSep 28, 2011
DSC05050.jpg
The electric department hooking up electrical for the street. (12-Jul-04)dozerSep 28, 2011