A footing is created about 10 inches high by about 10 cm. wide. Straight form wood is used to form the concrete. The concrete is poured around a metal rebar structure, of 3 hun full (vertical) with 2 hun full (cross supports). (16-Jan-04) dozerSep 28, 2011
|
|
Cement is poured using a large metal can as a form, about 30 cm square. (13-Jan-04) dozerSep 28, 2011
|
|
The base is cemented in place with a cement pour around 30 cm thick. dozerSep 28, 2011
|
|
The wide area show here will be for the entry gate. dozerSep 28, 2011
|
|
Supporting rebar structures, which are made by tying metal strands together are placed in the completed post hole. There is a metal base on the bottom of the structure. The metal used on the upright pieces is guage 3 hun full, the square supports are 2 hun full. dozerSep 28, 2011
|
|
Post holes like this are dug each 2.5 meters. The stick at the bottom signifies the center of the fence post to be poured. The hole is 60 cm square, 60 cm deep. (11-Jan-04) dozerSep 28, 2011
|
|
The completed inside of the 8 station circuit breaker. Note the addition of the ground wires (grounding electrode conductor). (09-Sep-04)dozerSep 28, 2011
|
|
The electric is feed in from the street to the roof and attaches here.dozerSep 28, 2011
|
|
This shows a large socket box with 5 small plugs and a telephone connection. The only problem with these small socket receptacles being so close together is you cannot really use two adjacent plugs, because typically plugs will be a bit too wide. dozerSep 28, 2011
|
|
Larger socket receptacles used in the kitchen.dozerSep 28, 2011
|
|
The official electric meter at the street. (21-Aug-04)dozerSep 28, 2011
|
|
The electric department hooking up electrical for the street. (12-Jul-04)dozerSep 28, 2011
|
|