happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSC04143.jpg
Finishing touches applied to the top of the perimeter wall foundation post.dozerSep 28, 2011
DSC04142.jpg
Stucco being applied to the perimeter wall.dozerSep 28, 2011
DSC04140.jpg
Laying a brick in place.dozerSep 28, 2011
DSC04139.jpg
To apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozerSep 28, 2011
DSC00040~0.jpg
A wall section (front and side) with completed support post structures. dozerSep 28, 2011
DSC00039.jpg
The support post is poured around the adjacent blocks using a form structure. dozerSep 28, 2011
DSC00037.jpg
Another view of the back wall. dozerSep 28, 2011
DSC00036.jpg
This is the entry way for the walk in gate. dozerSep 28, 2011
DSC00035.jpg
Another shot of the blocks. Note, there is a vertical piece of rebar put in place between the blocks close to the post for every block. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long.dozerSep 28, 2011
DSC00034.jpg
To add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozerSep 28, 2011
DSC00033.jpg
Another shot showing the footing with the rebar supports at 2.5 meter intervals. dozerSep 28, 2011
DSC00032.jpg
The footing will have the rebar supports at 2.5 meter intervals. dozerSep 28, 2011
7141 files on 596 page(s) 165

Debug Info 
Debug Output: show / hide