|
Last additions |
The front gutter system. (15-Aug-04)dozerSep 28, 2011
|
|
The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
|
|
Added the final gutter on top of the patio. (23-Jun-04)dozerSep 28, 2011
|
|
Interconnected gutters. (19-Jun-04)dozerSep 28, 2011
|
|
Brackets.dozerSep 28, 2011
|
|
A completed gutter section. (18-Jun-04)dozerSep 28, 2011
|
|
Installing brackets for the 6" gutter sections. (16-Jun-04)dozerSep 28, 2011
|
|
View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
|
|
The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
|
|
The paving stones are set in place.dozerSep 28, 2011
|
|
Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
|
|
Side planter box.dozerSep 28, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
133 | |
|
|
|
|
|
|
|