happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
DSC05125~2.jpg
The front gutter system. (15-Aug-04)dozerSep 28, 2011
DSC05121~1.jpg
The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
DSC05080~0.jpg
Added the final gutter on top of the patio. (23-Jun-04)dozerSep 28, 2011
DSC05042~0.jpg
Interconnected gutters. (19-Jun-04)dozerSep 28, 2011
DSC05037~2.jpg
Brackets.dozerSep 28, 2011
DSC05036~0.jpg
A completed gutter section. (18-Jun-04)dozerSep 28, 2011
DSC05029~0.jpg
Installing brackets for the 6" gutter sections. (16-Jun-04)dozerSep 28, 2011
DSC05151~1.jpg
View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
DSC05115~0.jpg
The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
DSC05104~0.jpg
The paving stones are set in place.dozerSep 28, 2011
DSC05103~0.jpg
Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
DSC05041~0.jpg
Side planter box.dozerSep 28, 2011
7141 files on 596 page(s) 133

Debug Info 
Debug Output: show / hide