Last additions |
Gate ArrivesThe stainless gate arrives a few weeks behind schedule, but arrives no the less!!dozerSep 28, 2011
|
|
Old GateThis gate was really heavy, maybe 200kg or more. It opened OK without too much effort due to stainless wheels, but was due for an upgrade.dozerSep 28, 2011
|
|
The poured lateral strength support member, called ?¸??¹€?¸• ?¸”?¸¶?¸‡ ?¹€?¸??¸² ?¹„?¸§?¹‰ (stay dung sow wai) beam which holds column in place. dozerSep 28, 2011
|
|
3 hun (9 mm) the specification of the metal strength. For higher grade metals they will have the strength specification imprinted on the metal surface, in this case SR 24. dozerSep 28, 2011
|
|
The upper ring beam partial pour. There are two pieces of 3 hun with the support being 2 hun. dozerSep 28, 2011
|
|
Existing section of rear wall done 4 years prior. The new wall section has been finished and rendered, but no pics of the rendered surface as of yet.dozerSep 28, 2011
|
|
The rear wall section where the new wall being done now was attached to the older wall. This rear section is about 20 meters in length. dozerSep 28, 2011
|
|
On 40 meter section prior to completion. dozerSep 28, 2011
|
|
One worker is doing the edging on the upper ring beam, the other is rendering the wall surface. Notice again the strength reinforcement which is a poured member that adds lateral strength to the wall segment. dozerSep 28, 2011
|
|
Sprinkling water on the wall surface during the rendering process. dozerSep 28, 2011
|
|
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozerSep 28, 2011
|
|
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozerSep 28, 2011
|
|