|
Last additions |

Grouted Tile SectionA completed and grouted section of tiles.dozerSep 28, 2011
|
|

Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozerSep 28, 2011
|
|

Leveling the TilesLeveling the tiles in place after they are laid. dozerSep 28, 2011
|
|

True LineA true line indicating where the edge of the tile should be. dozerSep 28, 2011
|
|

Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozerSep 28, 2011
|
|

Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozerSep 28, 2011
|
|

Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozerSep 28, 2011
|
|

Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozerSep 28, 2011
|
|

Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozerSep 28, 2011
|
|

New Electric ReceptacleA new electric receptacle is established. dozerSep 28, 2011
|
|

Height of TileThe red chalk line is established by measuring down from the level line.dozerSep 28, 2011
|
|

Tile: Level LineA level line is being determined for laying the tile. dozerSep 28, 2011
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
118 |  |
 |
 |
 |
|

|
|
|