happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions
IMG_0893.jpg
Grouted Tile SectionA completed and grouted section of tiles.dozerSep 28, 2011
IMG_0890.jpg
Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozerSep 28, 2011
IMG_0889.jpg
Leveling the TilesLeveling the tiles in place after they are laid. dozerSep 28, 2011
IMG_0877.jpg
True LineA true line indicating where the edge of the tile should be. dozerSep 28, 2011
IMG_0872.jpg
Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozerSep 28, 2011
IMG_0871.jpg
Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozerSep 28, 2011
IMG_0869.jpg
Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozerSep 28, 2011
IMG_0866.jpg
Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozerSep 28, 2011
IMG_0865.jpg
Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozerSep 28, 2011
IMG_0864.jpg
New Electric ReceptacleA new electric receptacle is established. dozerSep 28, 2011
IMG_0838.jpg
Height of TileThe red chalk line is established by measuring down from the level line.dozerSep 28, 2011
IMG_0833.jpg
Tile: Level LineA level line is being determined for laying the tile. dozerSep 28, 2011