Last additions
IMG_1656.jpg
Original View ToiletThe original view of the toilet and stained tile area.dozerSep 28, 2011
IMG_1043.jpg
Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozerSep 28, 2011
KTFinishedView.youtube
Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozerSep 28, 2011
KSams-0052.jpg
Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozerSep 28, 2011
KSams-0046.jpg
Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozerSep 28, 2011
KSams-0045.jpg
Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozerSep 28, 2011
IMG_1041.jpg
Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozerSep 28, 2011
IMG_1038.jpg
Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozerSep 28, 2011
IMG_1034.jpg
Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozerSep 28, 2011
IMG_0921.jpg
Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozerSep 28, 2011
IMG_0913.jpg
Wall ImprefectionThe painter fixing a wall imperfection. dozerSep 28, 2011
IMG_0900.jpg
Grouting the SkirtingGrouting the skirting and floor tiles. dozerSep 28, 2011
7141 files on 596 page(s) 117