|
Last additions |
FlintkoteA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozerSep 28, 2011
|
|
CeilingPlastering up the joints and screw heads in the new ceiling.dozerSep 28, 2011
|
|
Preparing for New Control BoxPreparing the wiring for a new square D electrical panel.dozerSep 28, 2011
|
|
Electric in CeilingLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozerSep 28, 2011
|
|
FlintkoteStarting to flintkote the floor area. dozerSep 28, 2011
|
|
Laying in the PlumbingEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozerSep 28, 2011
|
|
Removing Existing SinkThe above counter mount sink was removed and this granite counter will be removed.dozerSep 28, 2011
|
|
Existing Above Ceiling AreaThese pipes in the ceiling area are from the condo above. dozerSep 28, 2011
|
|
Tile RemovalThe tile removal took longer than anticipated.dozerSep 28, 2011
|
|
Don't Buy a ToiletDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozerSep 28, 2011
|
|
Original Kitchen GraniteThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozerSep 28, 2011
|
|
Original View BathtubThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozerSep 28, 2011
|
|
7141 files on 596 page(s) |
|
|
|
|
|
116 | |
|
|
|
|
|
|
|