Last additions - Phala - "Plumbing" |
2 MayA view looking along the back wall and the partly buried drain pipes and boxes.pklongballMay 02, 2009
|
|
29 AprilMore of the pipes as they come to the yet to be installed sewer pipe.pklongballMay 02, 2009
|
|
29 AprilAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongballMay 02, 2009
|
|
29 AprilNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongballMay 02, 2009
|
|
29 AprilThe sewer drain trench along one side of the land.pklongballMay 02, 2009
|
|
29 AprilGuest bath rough-in for the sink and location of the water heater.pklongballMay 02, 2009
|
|
29 AprilHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongballMay 02, 2009
|
|
29 AprilMaster bath plumbing is now roughed-in. Minimal pipes in the floorpklongballMay 02, 2009
|
|
28 AprilDifferent view of the septic tank and some of the early pipe work. You can also see the trench that will have a pipe to carry the grey water and septic water away.pklongballMay 02, 2009
|
|
28 AprilHere we see and assortment of supply and drains. The open wall cavity allows them to put in both bathrooms at the same time. Only a minimal amount of pipes are buried in the floor tile.pklongballMay 02, 2009
|
|
28 AprilThese two water men are installing the cold supply lines. White shirt is the bossmanpklongballMay 02, 2009
|
|
28 AprilThe start of installing the drain lines in one bathroompklongballMay 02, 2009
|
|
|
|
|
|