11 March 2009We now have a small team of 2 men and a woman working on the walls. The first process will be to start a course up to a level just below any window openings or on a wall with no window about half way up. They will stop there to begin another wall. Once all the walls are started with the outer course we will call in he electrician to start installing the conduits in the cavities for all the plugs and switches.pklongballMar 12, 2009
|
|
11 March 2009Wall man fixes a wood form to the floor to make the corner walls for the store room bedroom wallspklongballMar 12, 2009
|
|
9 March 2009Moving the blocks from point A to point B is backbreaking and sweaty work and always the ladies get this job.pklongballMar 09, 2009
|
|
9 March 2009Moving the Q Con blocks into positionpklongballMar 09, 2009
|
|
9 March 2009This is the beginning of the wall work. Nothing dramatic yet but needs to be done. Two ladies were assigned the job of moving the 2,000 odd blocks onto the floor area in selected places to make them ready for the wall team to start installing them.pklongballMar 09, 2009
|
|
6 March 09'Today the Q-Con blocks were delivered to the site. Total on the truck was 2,000 blocks. The walls will begin soon.pklongballMar 06, 2009
|
|
|
|