Assembling the rebar cages for the columns. Rick BFeb 06, 2008
|
|
This is a double pile footer arrangement. A single column will come out of this hole.Rick BFeb 06, 2008
|
|
Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick BFeb 06, 2008
|
|
Raising the ceremonial columns. Our ceremony involved two columns.Rick BFeb 06, 2008
|
|
Laying out the pile locationsRick BFeb 06, 2008
|
|
Piles being deliveredRick BFeb 06, 2008
|
|
Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick BFeb 06, 2008
|
|
Laying out the footer locations and dimensionsRick BFeb 06, 2008
|
|
|
|
|
|