happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Rick B > Rick B's House

Last additions - Rick B's House
DSC02148_-_FIrst_Floor_Columns_-_122807.JPG
First floor columns' forms are being assembled after the floor beams were completed.Rick BFeb 06, 2008
DSC02151_-_First_Floor_Columns_-_122807.JPG
First floor columns are being fitted with formsRick BFeb 06, 2008
DSC02154_-_First_Floor_Foundations_-_010808.JPG
First floor beams are ready for the floor slabs (pan peun)Rick BFeb 06, 2008
DSC02160_-_Floor_Sabs_-_010808.JPG
Pre-stressed floor slabs for the first floor are being delivered direct from the factoryRick BFeb 06, 2008
DSC02094_-_First_Floor_Foundations_-_121507.JPG
Rebar for the first floor beams is being assembled in place.Rick BFeb 06, 2008
DSC02117_-_First_Floor_Foundation_-_122107.JPG
Forms and rebar for the first floor beams are ready for the concrete pour.Rick BFeb 06, 2008
DSC02112_-_First_Floor_Foundations_-_122107.JPG
Forms for the first floor beams are being assembled.Rick BFeb 06, 2008
DSC02118_-_First_Floor_Foundation_-_122107.JPG
Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick BFeb 06, 2008
DSC02038_-_Footer_and_Column_Rebar_Cages_-_112207.JPG
A typical footer and column placed on top of a single pile.Rick BFeb 06, 2008
DSC02052_-_Raising_Final_Columns_-_112307.JPG
All columns for the house are now raised.Rick BFeb 06, 2008
DSC02066_-_Rebar___Forms_Lower_Foundation_-_112707.JPG
Columns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick BFeb 06, 2008
DSC02067_-_Lower_Block_Work_around_house_-_112907.JPG
Blocks installed on top of ground level beam to enclose the crawl spaceRick BFeb 06, 2008
92 files on 8 page(s) 7

Debug Info 
Debug Output: show / hide