First floor columns' forms are being assembled after the floor beams were completed.Rick BFeb 06, 2008
|
|
First floor columns are being fitted with formsRick BFeb 06, 2008
|
|
First floor beams are ready for the floor slabs (pan peun)Rick BFeb 06, 2008
|
|
Pre-stressed floor slabs for the first floor are being delivered direct from the factoryRick BFeb 06, 2008
|
|
Rebar for the first floor beams is being assembled in place.Rick BFeb 06, 2008
|
|
Forms and rebar for the first floor beams are ready for the concrete pour.Rick BFeb 06, 2008
|
|
Forms for the first floor beams are being assembled.Rick BFeb 06, 2008
|
|
Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick BFeb 06, 2008
|
|
A typical footer and column placed on top of a single pile.Rick BFeb 06, 2008
|
|
All columns for the house are now raised.Rick BFeb 06, 2008
|
|
Columns have been poured from the footer up to just below the first floor elevated beams. Rebar for beam to hold wall surrounding the crawl space is also being assembled.Rick BFeb 06, 2008
|
|
Blocks installed on top of ground level beam to enclose the crawl spaceRick BFeb 06, 2008
|
|
|
|
|
|