happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Renovations and Maintenance > View Talay 2 Condo

Last additions - View Talay 2 Condo
IMG_3137.jpg
Preparing for New Control BoxPreparing the wiring for a new square D electrical panel.dozerSep 28, 2011
IMG_3136.jpg
Electric in CeilingLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozerSep 28, 2011
IMG_3131.jpg
FlintkoteStarting to flintkote the floor area. dozerSep 28, 2011
IMG_3127.jpg
Laying in the PlumbingEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozerSep 28, 2011
IMG_3118.jpg
Removing Existing SinkThe above counter mount sink was removed and this granite counter will be removed.dozerSep 28, 2011
IMG_3117.jpg
Existing Above Ceiling AreaThese pipes in the ceiling area are from the condo above. dozerSep 28, 2011
IMG_3115.jpg
Tile RemovalThe tile removal took longer than anticipated.dozerSep 28, 2011
IMG_3109.jpg
Don't Buy a ToiletDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozerSep 28, 2011
IMG_3019.jpg
Original Kitchen GraniteThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozerSep 28, 2011
IMG_1657.jpg
Original View BathtubThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozerSep 28, 2011
IMG_1656.jpg
Original View ToiletThe original view of the toilet and stained tile area.dozerSep 28, 2011
 
35 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide