Last additions - View Talay 2 Condo |
SinkThe sink is left to dry after it is installed along with the granite counter top.dozerSep 28, 2011
|
|
Adhesive Concrete MixApplying an adhesive concrete mix to support the granite skirting.dozerSep 28, 2011
|
|
Granite Faucet HoleOn site drilling of the faucet hole for the granite counter.dozerSep 28, 2011
|
|
Toilet AdjustorThe toilet adjust that allows the center of the toilet hole to be less than 30.5 cm (as in this case).dozerSep 28, 2011
|
|
Trim PieceInstalling the aluminum trim piece.dozerSep 28, 2011
|
|
Floor LevelThe floor is poured level in preparation of the floor tiles.dozerSep 28, 2011
|
|
Wall TileWeber 'tile fix' tile adhesive is applied to the back of the wall tile prior to setting it in place.dozerSep 28, 2011
|
|
Installing Square D PanelInstalling the 6 station square D panel.dozerSep 28, 2011
|
|
Wall TilesThe wall tiles laid with the appropriate holes for the faucets. Note also the silver color aluminum trim piece that will be used for edging. dozerSep 28, 2011
|
|
FlintkoteAn important step that if omitted can cause problems later on with moisture seepage to the ceiling of the lower floor. dozerSep 28, 2011
|
|
FlintkoteA water proof paint is applied to the sub floor to ensure that moisture can't penetrate to the condo below. dozerSep 28, 2011
|
|
CeilingPlastering up the joints and screw heads in the new ceiling.dozerSep 28, 2011
|
|
|
|
|
|