Grounded ElectricA new grounded electric receptacle with a telephone jack that will be routed up through the ceiling.dozerSep 28, 2011
|
|
Leveling the TilesLeveling the tiles in place after they are laid. dozerSep 28, 2011
|
|
True LineA true line indicating where the edge of the tile should be. dozerSep 28, 2011
|
|
Applying the Slurry MixApplying the slurry adhesive mix to the underside of the tile. This then gets placed on the drypack.dozerSep 28, 2011
|
|
Water LineThe water line run under the tiles. The tiles are laid with 2mm spacers in this project. dozerSep 28, 2011
|
|
Starting TilingThe heavy granito tiles are laid in dry pack, electric line and water line will be under the tile. dozerSep 28, 2011
|
|
Secured Flexi PipeThe flexi pipe is run into the bathroom and is secured in place.
dozerSep 28, 2011
|
|
Water LineA water line using flexi pipe is to be run under the tiles. Flexi pipe is used since there are no junctions anywhere in the pipe run.dozerSep 28, 2011
|
|
New Electric ReceptacleA new electric receptacle is established. dozerSep 28, 2011
|
|
Height of TileThe red chalk line is established by measuring down from the level line.dozerSep 28, 2011
|
|
Tile: Level LineA level line is being determined for laying the tile. dozerSep 28, 2011
|
|
Prepping to PrimerGetting the wall ready to primer. The upper trim is kept, caulking is being applied to the between the concrete ceiling and the trim. Wall paper is being scrapped off. dozerSep 28, 2011
|
|
|
|
|
|