Last additions - Kiang Talay Condo |

Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozerSep 28, 2011
|
|

Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozerSep 28, 2011
|
|

Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozerSep 28, 2011
|
|

Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozerSep 28, 2011
|
|

Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozerSep 28, 2011
|
|

Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozerSep 28, 2011
|
|

Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozerSep 28, 2011
|
|

Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozerSep 28, 2011
|
|

Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozerSep 28, 2011
|
|

Wall ImprefectionThe painter fixing a wall imperfection. dozerSep 28, 2011
|
|

Grouting the SkirtingGrouting the skirting and floor tiles. dozerSep 28, 2011
|
|

Grouted Tile SectionA completed and grouted section of tiles.dozerSep 28, 2011
|
|
|

|
|
|