Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozerSep 28, 2011
|
|
Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozerSep 28, 2011
|
|
The roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozerSep 28, 2011
|
|
The house footing being formed. The footing of this house is about 20 inches tall. Inside the footing there is a metal substructure for strength. Off to the left of this footing you can see the hand tied metal substructure in preparation to pour another footing. To the right you see the form wood which is used to form the concrete pour. (05-Mar-04)dozerSep 28, 2011
|
|
The footing of a foundation column. (29-Feb-04)dozerSep 28, 2011
|
|
The perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozerSep 28, 2011
|
|
This is the starting shot, showing the plot leveled. The plot starts before the truck on the left and goes to the corner tree line. By this point the plot has already been leveled with fill dirt. (01-Jan-04)dozerSep 28, 2011
|
|
|
|
|
|
|