happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2 > Plumbing

Last additions - Plumbing
IMG_8851.jpg
Drain Pipe TestDrain pipes are also tested against concrete contamination if they have ever been left uncapped, prior to the external wall being laid. dozerSep 27, 2011
IMG_9029.jpg
Hole for Submerged Water TankThis shows the start of the 1800 liter underground water tank. dozerSep 27, 2011
IMG_9044.jpg
Septic Service OpeningThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozerSep 27, 2011
IMG_9045.jpg
Septics Prior to Walkway PourThis shows the septics prior to the walkway being poured. dozerSep 27, 2011
28 files on 3 page(s) 3

Debug Info 
Debug Output: show / hide