Last additions - Plumbing |
Framed and Poured External WallsAfter the floor pour is completed, the framework as seen is installed and the external walls are poured to a thickness of 15 centimeters. dozerSep 27, 2011
|
|
Simple SepticAnother view of a simple septic system with the waste pipe entering the concrete rings a a sufficient angle to allow flow. All of the septics are vented with the exhaust about the perimeter wall. dozerSep 27, 2011
|
|
Poured Underground Water TankThe poured underground water tank. The wall thickness is 15 centimeters. The dimensions are about 2.5 meters x .70 meter width by 1 meter depth. dozerSep 27, 2011
|
|
Undermount Stainless Kitchen SinkThe under mount stainless kitchen sink will sit under the custom cut granite counter top.dozerSep 27, 2011
|
|
Additonal Waterproofing Agent Applied to the BottomLanko K11 waterproofing agent is skim coated on the bottom (as shown) and will be applied to the sides of the enclosure as well. dozerSep 27, 2011
|
|
Framing for Top of EnclosureThe framing for the top of enclosure. Notice the rebar lattice with spacing of 20 centimeters. The lid/service opening is sized at 50 centimeters by 50 centimeters. There is an entry pipe, water level solenoid pipe, and exit pipe (to feed to the automatic water pump into the house). dozerSep 27, 2011
|
|
SepticsThere are overall three septics, each consists of five one meter diameter concrete rings with a four centimeter surrounding gravel pad.dozerSep 27, 2011
|
|
Plumbing Drain PipesThis shows what is to be the bathroom floor. Note the 4" solid waste drain and 2" shower drain. The smaller diameter pvc pipes are the pressurized water service pipes which will run from the automatic pump to the inbound fitting within the wall of the house.dozerSep 27, 2011
|
|
Pipes CappedNotice that in this shot the damp course has been put in place along with the support rebar for the floor pour. All drain pipes + inbound water pipes have been properly 'capped' (see the end of the PVC pipe) with a removable 'hat'. This will prevent any concrete contamination from entering and restricting flow within the pvc piping during the construction process. dozerSep 27, 2011
|
|
Pipes after Floor PourA view of the bathroom floor pvc drain pipes + inbound water pipes after the bathroom floor has been poured. There are 2 floor drain pipes, a solid waste drain pipe, a sink drain pipe, and three inbound water pipes. dozerSep 27, 2011
|
|
Pressurized Water Pipe TestA water test must be preformed early on in the building process. This test ensures that there are no leaks within the system. The automatic pump is set up and a run-in test is preformed for 24 hours. If there are any leaks in the system the pump will cycle on during the test. dozerSep 27, 2011
|
|
Capped PipesClose up of the caps temporarily used on the drain pipes.dozerSep 27, 2011
|
|
|
|
|
|