happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #1 > Main Structure

Last additions - Main Structure
DSC03131.JPG
Glass BlocksThis shot shows glass blocks being installed and the use of plastic spacers at the intersections to keep the blocks equidistant (spacing of 1 cm). dozerSep 27, 2011
IMG_4041.JPG
Burnt Rice HuskBurnt rice husk, as pictured here, makes an excellent insulator. In this project it was used in designated open over size cinderblock holes as an insulator. It can be found at most stores that sell garden supplies, not only is it functional, but also clean and inexpensive. dozerSep 27, 2011
IMG_3916.JPG
Form Work for Beam #2The formwork for the pour of the beam. Note the 12mm rebar laid horizontally within the beam is wire tied to each vertical piece of rebar.
dozerSep 27, 2011
IMG_3782.JPG
Block being laidLaying another block in place. The blocks are lifted up over the vertically extending rebar and laid into place.
dozerSep 27, 2011
IMG_3625.JPG
Completed Ground BeamThis shows the completed ground beam with the noted vertical rebar. Depth indicators are being put in the ground in preparation of the concrete pour of the floor.dozerSep 27, 2011
IMG_3587.JPG
Ground Beam PourPour in the front portion of the house. Note the two column frames which are at the front of the patio (the rest of the house has no columns). The concrete is shoveled in place and worked with a vibrator.

dozerSep 27, 2011
IMG_3565.JPG
Slump TestCPAC ready mix cement quality control (QC) staff perform a slump test. This is a standard test which is done to verify that the concrete is 'firm' enough. The slump is measure from the top of the cone and is specified to be between 5 to 10 cm.
dozerSep 27, 2011
Concrete_Compressive_Strength.JPG
Concrete Compressive Strength VerificationThis report shows the results of the compressive strength test on the concrete samples taken by the quality control staff. It is a good verification as the quality of the concrete used in the foundation is significant.dozerSep 27, 2011
IMG_3917.JPG
Another shot of the bathroom wall, showing the decorate glass block inserts, which are, in the case of the bathroom, inserted 2 blocks thick. The outside block of these group of 4 blocks, which will be located in the shower stall, are opaque (the light will come in, but shapes cannot be made out inside the shower stall).
dozerSep 27, 2011
IMG_3939.JPG
Oversize Cinderblock Laying ProceedsThe block laying proceeds on top of the second horizontal beam. Note the vertical vent PVC pipes extend upward through designated holes in the blocks.
dozerSep 27, 2011
IMG_3959.JPG
A lintel will be poured on top of each section of decorative glass blocks as if they were a window. No load bearing capabilities for the glass blocks are assumed.
dozerSep 27, 2011
IMG_3965.JPG
20 cm. Thick LintelThis shows a finished 20 cm. lintel above the glass blocks.
dozerSep 27, 2011
64 files on 6 page(s) 2

Debug Info 
Debug Output: show / hide