happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Welding Projects

Last additions - Welding Projects
DSCN0472.jpg
Bunk Bed Bolt AttachmentsThe brackets which allow the bunk bed to be assembled/disassembled with bolts. dozerSep 27, 2011
IMG_2451~0.jpg
Security MetalThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozerSep 27, 2011
Photo-0023.jpg
HeadboardPainting a head board just welded with the foot board visible behind it. dozerSep 27, 2011
IMG_2928.jpg
Shelving for StorageOK, not actually anything welded, but they did cut, assemble and put together several sets of shelving. dozerSep 27, 2011
IMG_2918.jpg
Metal Roof on Storage ShedThis metal roof was welded on this storage shed after the old corrugated roofing became problematic. dozerSep 27, 2011
IMG_2853.jpg
Storage CabinetsWelded together several of these storage cabinets with the exterior being metal mesh. The design using mesh allows stuff to be hung on from the mesh with U hooks. dozerSep 27, 2011
IMG_2846.jpg
Storage CabinetThe frame of the cabinet prior to attaching the wood shelving and latches. dozerSep 27, 2011
IMG_2810.jpg
Working on a GateFabricating one panel for a gate. dozerSep 27, 2011
IMG_2597~0.jpg
Security MetalWelding security metal in place. dozerSep 27, 2011
IMG_2593.jpg
Coming up with Curved PieceThe curved pieces of security metal are purchased already curved. Here the welder is curving a piece (from a straight one) since we had run out of the curved ones.dozerSep 27, 2011
IMG_2549.jpg
Working on Metal CabinetThe metal cabinet in the process of being welded - not sure what the hammer is for. dozerSep 27, 2011
IMG_2535.jpg
CabinetOne cabinet at the beginning. We had him do several of these, used for storage. dozerSep 27, 2011
23 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide