happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Welding Projects

IMG_2247.jpg
Partially Welded LadderA partially welded ladder that will be anchor bolt mounted on the wall to allow attic access through the service entry. dozer
IMG_2274.jpg
Satillite StandThis is the satellite stand used to support the 6' dish. dozer
IMG_2317.jpg
Barbed Wire SupportThis shows a support for barbed wire which utilizes tensioners that fit into the support. dozer
IMG_2365.jpg
Security MetalThe hand fabricated security metal. dozer
IMG_2443.jpg
SpacerA spacer tool to ensure the vertical metal bars are straight. dozer
IMG_2451~0.jpg
Security MetalThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozer
IMG_2535.jpg
CabinetOne cabinet at the beginning. We had him do several of these, used for storage. dozer
IMG_2549.jpg
Working on Metal CabinetThe metal cabinet in the process of being welded - not sure what the hammer is for. dozer
IMG_2593.jpg
Coming up with Curved PieceThe curved pieces of security metal are purchased already curved. Here the welder is curving a piece (from a straight one) since we had run out of the curved ones.dozer
IMG_2597~0.jpg
Security MetalWelding security metal in place. dozer
IMG_2810.jpg
Working on a GateFabricating one panel for a gate. dozer
IMG_2846.jpg
Storage CabinetThe frame of the cabinet prior to attaching the wood shelving and latches. dozer
23 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide