happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Granite Works

Last additions - Granite Works
DSCN0448.jpg
Undermount Ceramic SinkAn undermount ceramic sink. The granite is cut at the factory using the actual sink as a guide.dozerSep 27, 2011
DSCN0445.jpg
Undermount Stainless SinkAn undermount stainless sink.dozerSep 27, 2011
DSCN0419.jpg
Finished EdgeThe finished and grouted edge/corner of the granite counter top. dozerSep 27, 2011
IMG_2508.jpg
Undermount Sink Held in PlaceThe under mount sinks are secured in place after the granite is set and left to dry. dozerSep 27, 2011
Photo-0021.jpg
Desks Ready for Granite TopThe desks as built by the wood man (same one that did the wood trim painting and installation) as they sit ready for installation of the granite tops. dozerSep 27, 2011
IMG_2950.jpg
Desk FittingThe installer adjusting the cut and edged granite to have the same overhang on all sides. dozerSep 27, 2011
IMG_2948.jpg
DeskOne desk with the granite top installed, the other ready to go. dozerSep 27, 2011
IMG_2947.jpg
Silicone AdhesiveUsing sony brand silicone adhesive to glue the granite top to the desk. dozerSep 27, 2011
IMG_2945.jpg
Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozerSep 27, 2011
IMG_2943.jpg
Adjusting the Counter TopThe countertop being adjusted. dozerSep 27, 2011
IMG_2506.jpg
Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozerSep 27, 2011
IMG_2505.jpg
Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozerSep 27, 2011
18 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide