happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Secured Storage Room

Last additions - Secured Storage Room
DSCN0470.jpg
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozerSep 27, 2011
DSCN0471.jpg
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozerSep 27, 2011
IMG_2566.jpg
Finished Secured Metal PartitionThe completed metal partition with door. dozerSep 27, 2011
IMG_2528.jpg
Rear WindowThe secured rear opening. dozerSep 27, 2011
IMG_2179.jpg
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozerSep 27, 2011
IMG_2178.jpg
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozerSep 27, 2011
IMG_2177.jpg
Partial DoorThe beginning of the door and lower panel. dozerSep 27, 2011
IMG_2158.jpg
Guide LinesEstablishing a guide line for the cross supports. dozerSep 27, 2011
IMG_2124.jpg
Welding Lower BeamWelding the lower beam in place. dozerSep 27, 2011
IMG_2122.jpg
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozerSep 27, 2011
IMG_2118.jpg
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozerSep 27, 2011
IMG_2112.jpg
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozerSep 27, 2011
15 files on 2 page(s) 1

Debug Info 
Debug Output: show / hide